● Hosted trial · No login requiredAuto-reset after inactivity: 60:00
01 · Accepted Customer Proposal
Trial mode: the supplied Pylon proposal can populate sample verified-in-chat details. Other links require manual entry until live Pylon integration is connected.
All mounting materials are Schletter. Racking formulas are planning rules only and must be checked against the actual roof layout. L Foot / tile hook quantities are provisional. End clamps are rounded up to a multiple of 4. The 60-minute timer resets on activity and clears all unsaved jobs when it expires.
02 · Material Order Preview Editable quantities
| Material | Rule | Qty | Unit |
|---|
03 · Jobs Ready to Order
0 jobs| # | Job reference | Customer | System | Roof | Items | |
|---|---|---|---|---|---|---|
| No jobs added yet. Build a stock order above, then click “Add Job to Order Queue”. | ||||||
Excel export includes an All Orders sheet, a Consolidated Materials sheet, and a separate sheet for each job. If the Excel library cannot load offline, an Excel-compatible .xls file is exported instead.